At Partum Engineering we deliver exceptional electrical engineering solutions with a commitment to quality and sustainability, ensuring reliable and future-ready projects.
Filter By
Bench Factory and Site Testings, Civil and Structural, , Power and Earthing System Studies, Primary and Secondary Electrical, Protection SCADA and Communications, Substation Design
Cloudbreak West and Christmas Creek 220/33kV Substations
Delivering integrated substation design solutions to power Fortescue’s Pilbara operations as part of a major transmission upgrade.
READ ARTICLELines and Cables, Power and Earthing System Studies
Western Turner Syncline 33kV Line Design
Powering Progress: Delivering Reliable 33kV Solutions for Rio Tinto’s Western Turner Syncline Expansion
READ ARTICLELines and Cables, Power and Earthing System Studies
Eliwana Mine – 33kV Overhead Distribution Network
As part of the new Fortescue Eliwana mine, Partum was engaged in the design of the 33kV overhead distribution network.
READ ARTICLECivil and Structural, Primary and Secondary Electrical, Protection SCADA and Communications, Substation Design
Solomon 132kV Substation – New Circuit
Expanding Solomon’s 132kV substation with seamless integration of new switchgear, protection, and SCADA systems for enhanced network capacity.
READ ARTICLECivil and Structural, , Primary and Secondary Electrical, Protection SCADA and Communications
Western Renewables Link Early Contractor Involvement (ECI)
Concept design of a Digital Substation (IEC61850 standards) 500kV Terminal Station to support connection of the Western Renewable Zone to…
READ ARTICLE, Lines and Cables, Power and Earthing System Studies
OB24 to OB25 Haul Road Crossing
Ensuring safe and reliable haul road construction with expert powerline clearance solutions
READ ARTICLELines and Cables, Power and Earthing System Studies
Pilbara Transmission Project (PTP) Stage 3 220kV Transmission Line
Delivering a resilient 98km 220kV transmission line for Fortescue’s Pilbara Transmission Project, ensuring reliability from North Star Junction to Kanyirri.
READ ARTICLECivil and Structural, Power and Earthing System Studies, Preliminary Site Investigations, Primary and Secondary Electrical, Protection SCADA and Communications, Substation Design
100MW/200MWh Battery Energy Storage System (BESS)
Design and Engineering of Advanced High-Capacity Substation and Battery Energy Storage System
READ ARTICLECivil and Structural, Power and Earthing System Studies, Primary and Secondary Electrical, Protection SCADA and Communications, Substation Design
Solomon 220/132/11kV Substation
Innovative 220kV GIS substation design powering Fortescue’s Pilbara Transmission Project with reliability, efficiency, and future-ready scalability.
READ ARTICLE










