WestGold Beta Hunt Mine Power Supply Upgrade
Empowering WestGold’s Beta Hunt mine with tailored high-voltage solutions to enhance capacity, safety, and operational efficiency.
READ ARTICLECivil and Structural, Power and Earthing System Studies, Primary and Secondary Electrical, Protection SCADA and Communications, Substation Design
Solomon 220/132/11kV Substation
Innovative 220kV GIS substation design powering Fortescue’s Pilbara Transmission Project with reliability, efficiency, and future-ready scalability.
READ ARTICLECivil and Structural, , Primary and Secondary Electrical, Protection SCADA and Communications
Western Renewables Link Early Contractor Involvement (ECI)
Concept design of a Digital Substation (IEC61850 standards) 500kV Terminal Station to support connection of the Western Renewable Zone to…
READ ARTICLELines and Cables, Power and Earthing System Studies
, BHP OB24 to OB25 Haul Road Crossing
Ensuring safe and reliable haul road construction with expert powerline clearance solutions
READ ARTICLEPower and Earthing System Studies
Alcoa Earthing Standard
Elevating Alcoa’s standards with a comprehensive electrical earthing solution designed to safeguard WA’s mining operations.
READ ARTICLELines and Cables, Power and Earthing System Studies
Karratha Dampier 132kV Line Upgrade
Horizon Power’s Karratha Terminal (KRT) and Dampier Substation (DMP) is connected via a 19km single 132kV circuit KRT-DMP 81.
READ ARTICLELines and Cables, Power and Earthing System Studies
Rio Tinto Koodaideri 33kV Overhead Line
Delivering a robust 33kV overhead powerline network to power Rio Tinto’s Koodaideri mine with reliability and efficiency.
READ ARTICLECivil and Structural, Primary and Secondary Electrical, Protection SCADA and Communications
Snowy Hydro 2.0 Temporary Power Station
Providing power solutions for Snowy Hydro 2.0 temporary power station
READ ARTICLECivil and Structural, Primary and Secondary Electrical, Protection SCADA and Communications, Substation Design
Solomon 132kV Substation – New Circuit
Expanding Solomon’s 132kV substation with seamless integration of new switchgear, protection, and SCADA systems for enhanced network capacity.
READ ARTICLE