Project Scope
Project Scope

Alinta Energy’s Wagerup Battery Energy Storage System (BESS) is a 100 MW / 200 MWh battery facility located at the existing Wagerup Power Station, approximately 120 kilometres south of Perth, Western Australia.
Developed to strengthen the reliability and stability of the South West Interconnected System (SWIS), the facility can store electricity and dispatch up to 100 MW of power for approximately two hours. By providing flexible, rapid-response energy storage, the project supports the integration of renewable energy generation, helps manage fluctuations in electricity supply and demand, and provides essential system services and backup capacity when required.
Connected to the existing high-voltage infrastructure at Wagerup Power Station, the BESS represents an important investment in Western Australia’s evolving energy network, supporting the transition towards a more flexible, reliable and sustainable electricity system.
Partum Engineering’s Involvement
Partum Engineering was initially engaged through Genus to provide on-site engineering support before being directly appointed by Alinta Energy during the construction and commissioning phases of the project.
The engagement commenced with a comprehensive technical review of existing designs prepared by others. This process identified design deficiencies, incomplete documentation and areas requiring further engineering development to support construction, system integration and commissioning activities.
Partum Engineering subsequently delivered revised and new final designs, providing the technical expertise required to resolve outstanding engineering issues and support the project’s progression towards operational readiness.
Our involvement extended beyond design review and development to include system configuration, technical coordination and oversight of site testing and commissioning activities.
Challenges Overcome