Project Scope

Alinta Energy’s Wagerup Battery Energy Storage System (BESS) is a 100 MW / 200 MWh battery facility located at the existing Wagerup Power Station, approximately 120 kilometres south of Perth, Western Australia.

 

Developed to strengthen the reliability and stability of the South West Interconnected System (SWIS), the facility can store electricity and dispatch up to 100 MW of power for approximately two hours. By providing flexible, rapid-response energy storage, the project supports the integration of renewable energy generation, helps manage fluctuations in electricity supply and demand, and provides essential system services and backup capacity when required.

 

Connected to the existing high-voltage infrastructure at Wagerup Power Station, the BESS represents an important investment in Western Australia’s evolving energy network, supporting the transition towards a more flexible, reliable and sustainable electricity system.

 

Partum Engineering’s Involvement

 

Partum Engineering was initially engaged through Genus to provide on-site engineering support before being directly appointed by Alinta Energy during the construction and commissioning phases of the project.

 

The engagement commenced with a comprehensive technical review of existing designs prepared by others. This process identified design deficiencies, incomplete documentation and areas requiring further engineering development to support construction, system integration and commissioning activities.

 

Partum Engineering subsequently delivered revised and new final designs, providing the technical expertise required to resolve outstanding engineering issues and support the project’s progression towards operational readiness.

 

Our involvement extended beyond design review and development to include system configuration, technical coordination and oversight of site testing and commissioning activities.

Challenges Overcome

  • Redesign of initial Automation vendor SCADA & Communications panels within space and system constraints / limitations.
  • Working within a very tight delivery schedule.
  • Redesign during construction phase.
  • Design of OT network such that it would function, since original design had an inferior / non-functional architecture which resulted in limitations of the hardware. Developed and tested switch configurations to achieve a functional system with redundancy.
  • Identifying control system plant overall functionality gaps and then making recommendations and managing the various vendors to produce a functional integrated system.
  • Defining overall plant functionality and documenting in the various philosophies and FDS documentation.
  • Development and testing during hold point testing.
  • Debugging / fault finding Fire system during CTP made access to equipment very challenging.
  • Nominating critical I/O which was required for the systems to function, whilst having constraints due to the system architecture.
  • Developing procedures and test documentation and assisting battery vendor for commissioning.
  • Identifying gaps in SCADA systems, making recommendations and overseeing implementation.
  • Assisting and managing Fire system vendor with design to obtain a functional system.
  • Identifying Protection devices configuration gaps and engaging Partum Engineers to complete.
  • Managing SCADA vendor testing, formulating a test plan to ensure coverage, correct end to end test methods and completion to schedule.
  • No eStop integrated design was present. Created philosophy and FDS and oversaw implementation and testing.
  • Completing HVAC design for SCADA points.
  • Arranging CHAZOP to be conducted to identify areas and assign actions to meet schedule deadlines.
  • Identifying BMS system gaps and working with vendor to make firmware and configuration changes prior to approval to generate.
  • Battery module balancing requirements, hardware procurement and kick-off to ensure schedule was met.

Solution

  • Addition of key Gap I/O was achieved whilst commissioning was being undertaken.
  • OT Network backbone high reliability and traffic optimisation achieved required cycle times.
  • BESS OT Network segregation and redundancy achieved despite inferior architecture.
  • Overall system integration with all vendors systems achieved during SAT to provide a functional plant.
  • Project delivery achieved within tight schedule.
  • High plant reliability achieved.
  • Client recognition of unique, broad and specialised skillsets such that they are wanting to use Partum for other projects.
  • Reliable Fire system performance with minimal downtime.
  • Debugging features allowed for quick analysis and turnaround of remedial works, increasing plant availability during these types of events.