At Partum Engineering we deliver exceptional electrical engineering solutions with a commitment to quality and sustainability, ensuring reliable and future-ready projects.
Filter By
Bench Factory and Site Testings, Civil and Structural, Power and Earthing System Studies, Primary and Secondary Electrical
Dampier Resilience Project
Empowering Dampier’s Energy Future
READ ARTICLELines and Cables, Power and Earthing System Studies, Substation Design
North West Transmission Developments (NWTD)
Delivering critical transmission upgrades across North-West Tasmania for the NWTD
READ ARTICLECivil and Structural, Power and Earthing System Studies, Primary and Secondary Electrical
HMAS Stirling Garden Island
The HMAS Stirling electrical infrastructure was being upgraded to provide dual redundancy within their network, in particular to the Central…
READ ARTICLELines and Cables, Power and Earthing System Studies
Iron Bridge Mine 33kV Line design
Empowering Iron Bridge: Delivering Robust 33kV Solutions for a Dynamic Mining Landscape
READ ARTICLELines and Cables, Power and Earthing System Studies
Karratha Dampier 132kV Line Upgrade
Horizon Power’s Karratha Terminal (KRT) and Dampier Substation (DMP) is connected via a 19km single 132kV circuit KRT-DMP 81.
READ ARTICLELines and Cables, Power and Earthing System Studies
Eliwana Mine – 33kV Overhead Distribution Network
As part of the new Fortescue Eliwana mine, Partum was engaged in the design of the 33kV overhead distribution network.
READ ARTICLECivil and Structural, Power and Earthing System Studies, Primary and Secondary Electrical, Protection SCADA and Communications, Substation Design
Solomon 220/132/11kV Substation
Innovative 220kV GIS substation design powering Fortescue’s Pilbara Transmission Project with reliability, efficiency, and future-ready scalability.
READ ARTICLEBench Factory and Site Testings, , Power and Earthing System Studies, Protection SCADA and Communications, Substation Design
Rocklea and Windawarri Camp 11kV Network Upgrades
Delivering detailed design, modelling, and construction support for Rio Tinto’s 11kV network upgrades at Rocklea and Windawarri camps, overcoming legacy…
READ ARTICLEBench Factory and Site Testings, Civil and Structural, , Power and Earthing System Studies, Primary and Secondary Electrical, Protection SCADA and Communications, Substation Design
Cloudbreak West and Christmas Creek 220/33kV Substations
Delivering integrated substation design solutions to power Fortescue’s Pilbara operations as part of a major transmission upgrade.
READ ARTICLE










