At Partum Engineering we deliver exceptional electrical engineering solutions with a commitment to quality and sustainability, ensuring reliable and future-ready projects.
Filter By
Lines and Cables, Power and Earthing System Studies
Pilbara Transmission Project (PTP) Stage 3 220kV Transmission Line
Delivering a resilient 98km 220kV transmission line for Fortescue’s Pilbara Transmission Project, ensuring reliability from North Star Junction to Kanyirri.
READ ARTICLELines and Cables, Power and Earthing System Studies, Substation Design
North West Transmission Developments (NWTD)
Delivering critical transmission upgrades across North-West Tasmania for the NWTD
READ ARTICLECivil and Structural, , Lines and Cables, Power and Earthing System Studies, Primary and Secondary Electrical
Beta Hunt Mine Power Supply Upgrade
Empowering WestGold’s Beta Hunt mine with tailored high-voltage solutions to enhance capacity, safety, and operational efficiency.
READ ARTICLECivil and Structural, Power and Earthing System Studies, Primary and Secondary Electrical, Substation Design
Kanyirri 220/66/22KV Substation
Providing the design and engineering for an integral component of the Pilbara Transmission Project
READ ARTICLELines and Cables, Power and Earthing System Studies
Iron Bridge Mine 33kV Line design
Empowering Iron Bridge: Delivering Robust 33kV Solutions for a Dynamic Mining Landscape
READ ARTICLELines and Cables, Power and Earthing System Studies
Eliwana Mine – 33kV Overhead Distribution Network
As part of the new Fortescue Eliwana mine, Partum was engaged in the design of the 33kV overhead distribution network.
READ ARTICLELines and Cables, Power and Earthing System Studies
Solomon Substation to Queens Substation – 220kV Transmission Line
Development of a new 220 kV Single Circuit overhead transmission line for Fortescue from the existing Solomon substation to a…
READ ARTICLECivil and Structural, Primary and Secondary Electrical, Protection SCADA and Communications
Snowy Hydro 2.0 Temporary Power Station
Providing power solutions for Snowy Hydro 2.0 temporary power station
READ ARTICLEBench Factory and Site Testings, Civil and Structural, , Power and Earthing System Studies, Primary and Secondary Electrical, Protection SCADA and Communications, Substation Design
Cloudbreak West and Christmas Creek 220/33kV Substations
Delivering integrated substation design solutions to power Fortescue’s Pilbara operations as part of a major transmission upgrade.
READ ARTICLE










