At Partum Engineering we deliver exceptional electrical engineering solutions with a commitment to quality and sustainability, ensuring reliable and future-ready projects.
Filter By
Civil and Structural, Power and Earthing System Studies, Preliminary Site Investigations, Primary and Secondary Electrical, Protection SCADA and Communications, Substation Design
100MW/200MWh Battery Energy Storage System (BESS)
Design and Engineering of Advanced High-Capacity Substation and Battery Energy Storage System
READ ARTICLELines and Cables, Power and Earthing System Studies, Substation Design
North West Transmission Developments (NWTD)
Delivering critical transmission upgrades across North-West Tasmania for the NWTD
READ ARTICLELines and Cables, Power and Earthing System Studies
Koodaideri 33kV Overhead Line
Delivering a robust 33kV overhead powerline network to power Rio Tinto’s Koodaideri mine with reliability and efficiency.
READ ARTICLELines and Cables, Power and Earthing System Studies
Pilbara Transmission Project (PTP) Stage 3 220kV Transmission Line
Delivering a resilient 98km 220kV transmission line for Fortescue’s Pilbara Transmission Project, ensuring reliability from North Star Junction to Kanyirri.
READ ARTICLEPower and Earthing System Studies
Navel Communications Station Harold E Holt (NCSHEH) Facility HV Upgrade
Revitalising Critical Infrastructure Through Expert Design
READ ARTICLELines and Cables, Power and Earthing System Studies
Iron Bridge Mine 33kV Line design
Empowering Iron Bridge: Delivering Robust 33kV Solutions for a Dynamic Mining Landscape
READ ARTICLELines and Cables, Power and Earthing System Studies
Solomon Substation to Queens Substation – 220kV Transmission Line
Development of a new 220 kV Single Circuit overhead transmission line for Fortescue from the existing Solomon substation to a…
READ ARTICLECivil and Structural, Primary and Secondary Electrical, Protection SCADA and Communications
Snowy Hydro 2.0 Temporary Power Station
Providing power solutions for Snowy Hydro 2.0 temporary power station
READ ARTICLECivil and Structural, , Primary and Secondary Electrical, Protection SCADA and Communications
Western Renewables Link Early Contractor Involvement (ECI)
Concept design of a Digital Substation (IEC61850 standards) 500kV Terminal Station to support connection of the Western Renewable Zone to…
READ ARTICLE










