At Partum Engineering we deliver exceptional electrical engineering solutions with a commitment to quality and sustainability, ensuring reliable and future-ready projects.
Filter By
Power and Earthing System Studies
Onslow Iron Port Project HVS
Delivering comprehensive high-voltage engineering solutions for a new power generation and distribution system
READ ARTICLECivil and Structural, , Primary and Secondary Electrical, Protection SCADA and Communications
Western Renewables Link Early Contractor Involvement (ECI)
Concept design of a Digital Substation (IEC61850 standards) 500kV Terminal Station to support connection of the Western Renewable Zone to…
READ ARTICLELines and Cables, Power and Earthing System Studies
Koodaideri 33kV Overhead Line
Delivering a robust 33kV overhead powerline network to power Rio Tinto’s Koodaideri mine with reliability and efficiency.
READ ARTICLECivil and Structural, Power and Earthing System Studies, Primary and Secondary Electrical, Protection SCADA and Communications, Substation Design
Solomon 220/132/11kV Substation
Innovative 220kV GIS substation design powering Fortescue’s Pilbara Transmission Project with reliability, efficiency, and future-ready scalability.
READ ARTICLEPower and Earthing System Studies
Pannawonica Powerline EPR/LFI Hazard Assessment Report
Ensuring Safety at Pannawonica: Mitigating Electrical Hazards with Advanced EPR and LFI Analysis
READ ARTICLELines and Cables, Power and Earthing System Studies
Pilbara Transmission Project (PTP) Stage 3 220kV Transmission Line
Delivering a resilient 98km 220kV transmission line for Fortescue’s Pilbara Transmission Project, ensuring reliability from North Star Junction to Kanyirri.
READ ARTICLECivil and Structural, Lines and Cables, Power and Earthing System Studies
Juno Horizontal Bore Project
Providing the Juno Horizontal Dewatering Bore a permanent supply from FMG Solomon Mine
READ ARTICLECivil and Structural, Power and Earthing System Studies, Primary and Secondary Electrical
HMAS Stirling Garden Island
The HMAS Stirling electrical infrastructure was being upgraded to provide dual redundancy within their network, in particular to the Central…
READ ARTICLEPower and Earthing System Studies
Navel Communications Station Harold E Holt (NCSHEH) Facility HV Upgrade
Revitalising Critical Infrastructure Through Expert Design
READ ARTICLE










