The scope of work includes the design of:
- New 220kV double busbar line circuit at the Yurralyi Maya Power Station (YMPS) Substation.
- 15 km of dual circuit 220 kV transmission line between Karratha and Dampier.
- A 2x90MVA 220 kV/33/11kV Mesh substation at Rio Tinto’s Kangaroo Hill Bulk Supply Substation (KHBSS) site in Dampier.
- Protection and Auxiliary Supply Upgrades at the 220/33kV Dampier Bulk Supply Substation (DBSS).
- New 33 kV power line from KHBSS to DBSS.
- New 33kV power line from KHBSS to Horizon Power Dampier Substation.