PROJECT SCOPE
The 33kV overhead distribution network interconnecting the following:
- Mine Power Station.
- Ore Production and Trade Load Out Facilities.
- Telstra Radio Base Station.
- Administration and Laboratories.
The project comprised of 4,500m of a phosphorus and cherry phase conductor along with a 144 core single mode OPGW conductor throughout the various areas of supply.
Solution
- Effective two way and proactive communication with the client ensuring expectations met and exceeded.
- Previous experience utilised in the realignment of the powerlines.
- Additional foundation designed to minimise rock excavation.
- PLS CADD modelling to achieve optimal span lengths given the adverse terrain and avoidance areas.
- Complete preparation of the power and earthing system modelling as part of the HV submission deliverable.